Stanley Clark – Performing Arts Hall

Status

Bidding Closed

Bid Date 10/28/21 3:00pm

Company & Contacts

Holladay Construction Group
Daan Witkamp – dwitkamp@hcgllc.net  
(574) 876-4575

Location

3121 Miami Street South Bend, IN 46614

This project consists primarily of demolition of an existing building and construction of a new Performing Arts Hall to be constructed on the campus of the existing Stanley Clark School located at 3123 Miami Street in South Bend, Indiana.
The new building consists of a 7,800 square foot, single-story, steel-framed structure. The exterior walls are non-bearing and load-bearing steel studs with a brick veneer and fiber cement siding. Slight modifications to adjacent structures (RAC and Bernard Hall) are included.
Site development includes some demolition of existing drives and sidewalks, the construction of new drives and sidewalks, and site drainage work.
The principal exterior finish materials include masonry veneer, fiber cement board siding, aluminum-framed windows, aluminum-framed glass entrances and single-ply roofing.
The principal interior finishes include carpet and VCT flooring, painted gypsum board walls and suspended acoustical tile ceilings.